





The structure is built in Magnelis® steel with a QUALICOAT® paint coating. Unlike standard Z275 galvanised steel, Magnelis® actively protects cut edges, welds and fixing points, which is exactly where a court starts to corrode.
The design eliminates metal posts in the glass corners, creating a completely panoramic effect that enhances the viewing experience. This structure is suitable for both indoor and outdoor installations and withstands winds up to 140 km/h (87 mph), to European certification and testing standards.
For projects that do not allow ground drilling or permanent construction, a portable version of the structure is available, perfect for temporary events, rented venues, or clubs without building permits.
The Full Panoramic court includes a professional LED system by Led Projects, featuring eight 150W LINE model spotlights that provide uniform, high-quality illumination for all playing conditions.
Three pole designs are available: curved (default), Z-shaped, and straight—all customisable in colour and finished with corrosion-resistant coating to match the court structure.
For venues requiring higher visibility or architectural integration, lighting upgrades are available. These upgrades are ideal for competition-level venues, rooftop installations, or locations with minimal ambient lighting.
All lighting options comply with FIP regulations and are suitable for both indoor and outdoor use.
The Full Panoramic court features 12 mm tempered glass, engineered for superior strength, visibility, and performance. This premium glass solution ensures a seamless 360° experience, free of visual obstructions.
Each panel is installed using a high-strength polymer sealing system at the joints, which improves:
The Full Panoramic court includes high-performance turf by MONDO, designed specifically for padel. The standard model uses MONDOTURF NSF SHOT XN, a 10 mm texturized turf made with XNOVA monofilaments and silica sand infill. It offers excellent grip, controlled speed, and long-lasting durability with minimal maintenance. Available in green or blue.
For premium installations, the SUPERCOURT XN upgrade is available. It combines XNOVA and STX fibres in a 3+3 structure for sharper bounce, faster play, and a more professional feel.
In warm climates, a monofilament option is also available, offering better heat resistance and durability under direct sun.
All turf types are compliant with FIP standards, compatible with both traditional base layers and raised technical flooring systems, and built to perform under intensive use.


Production at our factory in Crevillente takes 30 days at most.
Allow 2 to 3 days to install one court. We offer two options: installation by a full MejorSet crew of 3 to 4 people, or installation by your own local team, guided by a MejorSet supervisor.
Our logistics department selects the best freight forwarders to deliver your court anywhere in the world.
Door to door by truck for shipments within Europe. CIF and CFR for sea freight.
The essentials are cleaning, redistributing the sand, removing fungus and moss, and checking the joints. When we hand over the court, our team gives you a short training session on maintenance.
Both work well. The right choice depends on the site. Two examples:
The foundation has two parts: the perimeter ground beam, where the structure is anchored, and the slab, which covers the playing area and the surrounding areas.
Flatness is one of the most important points. The surface must be completely even, with no bumps or dips, because unevenness causes three problems: